• Home
  • Shop
  • About
  • Exhibits
  • Contact me

jeanweaves

~ Jean Williams, Handweaver

jeanweaves

Monthly Archives: December 2016

Catching Up on Projects Interrupted

16 Friday Dec 2016

Posted by jeanweaves in Overshot, Placemats

≈ 5 Comments

Tags

creative inspiration, Overshot, Placemats, Weaving

As the year winds down, it’s a good time to finish those projects that I stepped away from for one reason or another.

Placemat in progress.

Placemat in progress.

Earlier in the fall, I started to explore how to weave overshot placemats more efficiently. Overshot is normally woven with two shuttles, one for the ground weft which gives the fabric stability, and the other with a heavier weft which makes the pattern. But weaving with two shuttles takes a bit more time. I wanted something that would weave quickly.

What to do?

I remembered trying a nifty little trick some time ago—turning the draft, making the warp act like the weft and vice versa. Then I can weave with just one shuttle.

So if I have an 8-shaft overshot which weaves with 10 treadles, turning it makes it a 10-shaft overshot woven with 8 treadles. The original ground weft is threaded into the warp and every other warp thread is weaving the tabby either on shaft 1 or shaft 2. And now the weft will act like the original warp—in other words, I can weave it with just one shuttle!

There are a few things to keep in mind. For one thing, look at the draft. You can’t weave a 10-shaft pattern on an 8-shaft loom! My original plan was to use my 8-shaft Baby Wolf. Only when I was ready to start winding the warp did I realize that it just wasn’t going to work that way! I do suffer from tunnel vision sometimes. Luckily, I have other looms.

Also, the warp will be very dense with both pattern and ground threads sharing dents in the reed, but because the pattern threads are floating either on the face or on the back, the warp should be sett as a balanced plain weave for the size of the ground warp. The pattern thread has to be sturdy and smooth to stand up to warp tension as well.

There at the top and bottom, the figures just don't match as they should.

There at the top and bottom, the figures just don’t match as they should.

And threading the warp exactly as the weft didn’t seem to work my first try. After weaving a few repeats, it didn’t look just right. Then I noticed that the figures above and below the diamond weren’t symmetrical. The drawdown looked fine on computer but not on the loom. Hmmm…

I checked the “usual suspects”— tie-up, treadling, threading. I enlarged the draft on the computer and that’s when I noticed that at the reversing point in the diamond, the weaving program had also reversed the tabby. On the loom, I had faithfully threaded all the ground threads on shafts 1 and 2, alternating all the way across. I should have reversed those ground threads as well as the pattern threads.

After rethreading, the figures are now symmetrical.

After rethreading, the figures are now symmetrical.

After some rethreading, it is now symmetrical. There are some other irregularities, but I will work on those with the next warp.  This is a retraining project after all. By the time I make it through the various color ways I had in mind, I ought to have the process down pat.

What projects are you finishing before year’s end?

Shop!

Follow Us

  • Facebook

Galleries

  • Towels to Use and to Give
  • Runners
  • Scarves for Him and Her
  • For the Table
  • Note Cards
  • Animals
  • Throws
  • The Linen Press
  • Privacy Policy

Subscribe

  • RSS - Posts
  • RSS - Comments

Archives

  • September 2020 (2)
  • October 2019 (1)
  • August 2019 (1)
  • July 2019 (2)
  • June 2019 (2)
  • March 2019 (1)
  • November 2018 (2)
  • September 2018 (1)
  • July 2018 (2)
  • May 2018 (2)
  • April 2018 (1)
  • February 2018 (2)
  • January 2018 (1)
  • December 2017 (1)
  • November 2017 (2)
  • October 2017 (3)
  • August 2017 (1)
  • July 2017 (1)
  • June 2017 (2)
  • May 2017 (2)
  • March 2017 (2)
  • February 2017 (2)
  • January 2017 (2)
  • December 2016 (1)
  • November 2016 (1)
  • October 2016 (2)
  • August 2016 (3)
  • June 2016 (1)
  • May 2016 (1)
  • March 2016 (2)
  • February 2016 (1)
  • January 2016 (1)
  • December 2015 (1)
  • November 2015 (3)
  • October 2015 (1)
  • September 2015 (4)
  • August 2015 (1)
  • July 2015 (2)
  • June 2015 (1)
  • May 2015 (1)
  • April 2015 (2)
  • March 2015 (2)
  • February 2015 (2)
  • January 2015 (2)
  • December 2014 (1)
  • November 2014 (3)
  • October 2014 (1)
  • September 2014 (2)
  • August 2014 (1)
  • July 2014 (3)
  • June 2014 (1)
  • May 2014 (2)
  • April 2014 (2)
  • March 2014 (2)
  • February 2014 (2)
  • January 2014 (2)
  • December 2013 (2)
  • November 2013 (1)
  • October 2013 (1)
  • September 2013 (3)
  • August 2013 (1)

Create a free website or blog at WordPress.com.

Cancel

 
Loading Comments...
Comment
    ×
    Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
    To find out more, including how to control cookies, see here: Cookie Policy